×

Conejo Summit Project (MND 2019-70444) - Conejo Center Drive and Ranch Conejo Boulevard

Mitigated Negative Declarations


The proposed project includes construction of a 15-building business park on 16 privately owned parcels. The 16 parcels include previously created lots that are approximately 49.83 acres (2,170,594.80 square-feet (SF); the proposed building footprints would cover approximately 17 acres (754,222 SF). The buildings would ranging in size from approximately 32,015 SF to 93,308 SF of floor space and the building heights would range from 37 to 41 feet. Typically, each building would have office space at the front of the building with warehouse/light manufacturing space in the rear. Primary access to the proposed buildings would be from Rancho Conejo Boulevard and Conejo Center Drive. Parking would be provided in surface lots, generally located around each building, for the ancillary office and industrial uses. In addition, utility hookups would be installed from existing lines within the streets to the proposed buildings. Landscaping would be installed on each lot. The lots would be located in three separate clusters: on the western side of Conejo Center Drive just northwest of the intersection of Conejo Center Drive and Conejo Spectrum Street; along the eastern side of Conejo Center Drive from Conejo Spectrum Street up to Rancho Conejo Boulevard; and north of the intersection of Conejo Center Drive and Rancho Conejo Boulevard, extending west to a parcel at the end of Rancho Conejo Boulevard. The lots would be located within Vesting Tentative Tract No. 6021 (VTTM 6021) and Vesting Tentative Tract No. 6022 (VTTM 6022).

Public Counter Hours

Monday: 7:30 a.m. to 3:00 p.m.

Tuesday: 7:30 a.m. to 5:00 p.m.

Wednesday: 9:30 a.m. to 5:00 p.m.

Thursday: 7:30 a.m. to 5:00 p.m.

Alternating Fridays: 8:00 a.m. to 5:00 p.m.


Hours are subject to change. Please call (805) 449-2500 prior to your visit.


Click here to download our 2025 Calendar At-A-Glance!

Environmental Documents

Conejo Summit Notice of Intent | Click here to open
Conejo Summit Initial Study/Draft Mitigated Negative Declaration | Click here to open
Conejo Summit Appendices A-E | Click here to open
Conejo Summit Appendices F-I | Click here to open