LEV Pump Stations
Improvements at Lone Oak, Erbes Road, and Ventu Pump Stations
This project involves the complete removal and replacement of existing roof systems, a section of CMU block wall, and various infrastructure components. Key tasks include the installation of new fencing, access gates, and valve replacements, as well as the replacement of asphalt pavement and concrete. Additional work includes the relocation of antenna poles, upgrades to electrical and communication systems, SCADA integration, and the installation of two new standby diesel generators. Other improvements will include replacing the existing switchboard, installing variable frequency drives (VFDs), motor control centers (MCCs), sub-base fuel tanks, sound attenuating enclosures, and appurtenances. All work is aimed at ensuring the efficient installation and operation of the system.
The Project timeline will run from February 10, 2025 through July 2026.
Budget/Funding:
A construction contract has been awarded to Pacific Hydrotech Corporation in the amount of $3,065,600. The project was funded in the Adopted FY 2024-25 Water Fund Capital Budget.
Project Impacts
Traffic Impact:
Partial lane closures will occur on Lone Oak Drive and Kathlene Drive during the delivery and replacement of fencing at the pump stations.
Water Service:
No water shutdowns are anticipated during construction. However, if any shutdown becomes necessary, residents will be notified at least 24 hours in advance.